MATERIAL SPECIFICATIONS


  • RCC framed structure to withstand wind and seismic loads for zone II.
  • Solid Block Masonry for external and internal works.
  • Internal: Single Coat Cement Plastering finished with gypsum/putty finish.
  • External: Double coat Sand faced Cement Plastering.
  • Ceiling: Single Coat Sand faced Plastering.
  • Main Door: Solid Wood/Engineered door frame to full width of jamb. Both Side Veneer pre Engineered Door shutter with Melamine/ PU polish Coating. Hardware of reputed make.
  • Internal Doors: Hard Wood frame with hard core solid flush shutter with one side veneer finished with Melamine/PU polish. Reputed make hardware.
  • Toilet Doors: Hardwood frame with hard core solid flush shutter with one side veneer finished with Melamine/PU polish and other side lamination. Reputed make hardware.
  • French door: Sliding type with Single glazing
  • Windows: UPVC/ Aluminum sliding windows
  • Internal and Ceiling: Two Coats of OBD on ceiling , Two coats of Acrylic Emulsion Paint over a base coat of primer on internal walls with roller finish.
  • External: Double coat Weather Shield Paint over a coat of primer.
  • Parking Area: OBD on ceiling and walls, parking signage with radium paint. Drive way route indicator with radium paint.
  • Toilets: Glazed Ceramic tiles dadoing upto 7’0” height
  • Utility/Wash: Glazed ceramic tiles dado upto 3’0” height.
  • Provision for normal water connections
All toilets will consist of:
  • Washbasin
  • Hot and cold mixer with overhead shower
  • Provision for Geyser
  • All CP fittings are of quality standard
  • Concealed copper wiring of standard make, in conduits for light, fan, plug and power points wherever necessary
  • Power plug for cooking range chimney, refrigerator, micro oven, mixer grinder in kitchen
  • Plug points for TV & Audio systems etc.
  • 3-Phase supply for each unit and individual meter boards
  • Miniature Circuit Breakers (MCB) & ELCB for each distribution board
  • Telephone/ Intercom provision for master bedroom and drawing room.
  • Telephone provision for master bedroom, drawing and intercom facility to all the units connecting security.
  • Vitrified tiles of standard make for drawing, dining, living, bedrooms and kitchen.
  • Good Quality acid resistant anti skid ceramic tiles for toilets
  • Concealed conduit provision for living room and master bed room
  • Concealed conduit provision for all flats
  • One Automatic passenger lift with V3F technology and one service lift with V3F technology
  • 100% DG backup with acoustic enclosure for common area and 750W backup for all apartments


Nov.15, 2017

Clubhouse: Work in Full Swing.

Newly Constructed Apartments Hyderabad
Nov.15, 2017

Tower D: Basement work in Progress.

Residential Flats in Gachibowli
Nov.15, 2017

Tower C: Basement work in Progress.

Newly Constructed Apartments Hyderabad
Oct.28, 2017

Tower C: Footing & Foundation Work Completed.

Newly Constructed Apartments Hyderabad
Oct.28, 2017

Tower D: Footing & Foundation Work Completed.

Residential Flats in Gachibowli
Oct.04, 2017

Tower C: Footing & Foundation Work in Progress.

Newly Constructed Apartments Hyderabad
Oct.04, 2017

Tower D: Footing & Foundation Work in Progress.

Residential Flats in Gachibowli
Sep.15, 2017

Tower F: Internal work in progress.

Newly Constructed Apartments Hyderabad
Sep.15, 2017

Tower E: Internal work in progress.

Residential Flats in Gachibowli
Sep.15, 2017

Club House: External Plastering work nearing completion.

Newly Constructed Apartments Hyderabad
August 15, 2017

Tower D: Excavation Completed.

Newly Constructed Apartments Hyderabad
August 15, 2017

Tower C: Excavation Completed.

Newly Constructed Apartments Hyderabad
July 31, 2017

Tower F:Structure Completed.

Newly Constructed Apartments Hyderabad
July 28, 2017

Tower E:Structure Completed.

Newly Constructed Apartments Hyderabad
June 16, 2017

Tower F:11th Floor Slab Completed.

Newly Constructed Apartments Hyderabad
June 16, 2017

Tower E:11th Floor Slab Completed.

Residential Flats in Gachibowli
June 16, 2017

Club House:Structure Completed.

Newly Constructed Apartments Hyderabad
May 22, 2017

Tower F:10th Floor Slab Completed.

Newly Constructed Apartments Hyderabad
May 22, 2017

Tower E:10th Floor Slab Completed.

Residential Flats in Gachibowli
May 22, 2017

Club House:Structure Completed.

Newly Constructed Apartments Hyderabad
Apr.17, 2017

Tower F:9th Floor Slab Completed.

Newly Constructed Apartments Hyderabad
Apr.17, 2017

Tower E:9th Floor Slab Completed.

Residential Flats in Gachibowli
Apr.17, 2017

Club House:3rd Floor Slab Completed.

Newly Constructed Apartments Hyderabad
Feb.13, 2017

Tower F:5th Floor Slab Completed.

Newly Constructed Apartments Hyderabad
Feb.13, 2017

Tower E:6th Floor Slab Initiated.

Residential Flats in Gachibowli
Jan.19, 2017

Tower F:4th Floor Slab Completed.

Newly Constructed Apartments Hyderabad
Jan.19, 2017

Tower E:5th Floor Slab Initiated.

Residential Flats in Gachibowli
Dec.9, 2016

Tower F: 3rd Floor Level Slab in Progress.

Newly Constructed Apartments Hyderabad
Dec.9, 2016

Tower E: 4th Floor Level Slab in Progress.

Residential Flats in Gachibowli
Dec 1, 2016

Tower G:Ready for Possession.

Newly Constructed Apartments
Dec 1, 2016

Tower H:Ready for Possession.

Newly Constructed Apartments Sale
Nov.5, 2016

Tower G: 3BHK Actual Images.

Newly Constructed Apartments
Nov.5, 2016

Tower H: 3BHK Actual Images.

Newly Constructed Apartments Sale
Nov.5, 2016

Tower F: 1st Floor Slab Completed.

Newly Constructed Apartments Hyderabad
Nov.5, 2016

Tower E: 2nd Floor Slab Completed.

Residential Flats in Gachibowli
August 27, 2016

Tower G:G+4 completed.

Residential Flats in Gachibowli Hyd
August 27, 2016

Tower H: External Plastering.

Residential Apartments in Hyderabad
August 27, 2016

Tower F: Basement Slab Initiated.

Residential Flats
August 27, 2016

Tower E:1st Basement Work Initiated.

Residential Flats in Gachibowli
July 27, 2016

Tower G: Internal Fixtures & Fittings Completed.

Residential Flats sale in Hyderabad
July 27, 2016

Tower H: Block Work Completed.

Newly Constructed Apartments
July 27, 2016

Tower F: Basement Slab Initiated.

Newly Constructed Apartments Sales
July 27, 2016

Tower E: Footing & Foundation Completed.

Newly Constructed Flats
July 2, 2016

Tower G: Internal Fixtures & Fittings Completed.

Newly Constructed
July 2, 2016

Tower H: Last Slab Cast and Block Work on Third Floor Completed.

Newly Constructed Flats Sales
July 2, 2016

Tower F: Footing & Foundation Completed, Basement Work Initiated.

Newly flats sale
July 2, 2016

Tower E: Footing & Foundation Completed.

Newly Constructed Apartments
June 6, 2016

Tower G: Internal Fixtures & Fittings in progress. Flooring, Single Coat Paint completed.

Newly Constructed
June 6, 2016

Tower H: 7th Floor Slab Completed.

2bhk flats sales
June 6, 2016

Tower F: Footing & Foundation Completed, Basement work initiated.

Newly Constructed Aapartments
June 6, 2016

Tower E: Footing & Foundation Work in Progress.

Newly Constructed flats sale Hyderabad
May 18, 2016

Tower G: Flooring Completed. Initiation of Fixtures Fittings & Painting.

May 18, 2016

Tower H: Initiation of 7th Slab.

Residential Flats in Gachibowli Hyderabad
May 18, 2016

Tower F: Footing Completed.

Residential Flats Hyderabad
May 18, 2016

Tower E: Footing In Progress.

Residential Flats in Gachibowli
April 27, 2016

Tower G: Flooring Completed. Internal painting in progress.

Residential Flats
April 27, 2016

Tower H: 3rd Floor Slab Completed.

Residential Flats Narsingi
April 27, 2016

Tower F: Footing Completed.

Residential Flats
April 27, 2016

Tower E: Excavation & Foundation Markings.

Residential Flats
Mar 16, 2016

Tower F, Footings.

Residential Flats
Mar 16, 2016

Tower H, Second Floor.

Residential Flats Hyderabad
Mar 16, 2016

Tower E, Excavation.

Residential Flats Hyderabad
Feb 13, 2016

Tower F, Construction commenced and in full swing.

Residential Flats
Feb 12, 2016

Tower H, G+2 slab completed

Flats sale
Jan 10, 2016

G+4 for Tower G is ready to move in

Residential Flats
Jan 10, 2016

Tower H, G+1 slab completed

jan
Nov 30, 2015

Tower G: Tower structure completed. Plastering work nearing completion.

nov
Nov 30, 2015

Tower H: Construction commenced, and in full swing.

Residential Flats in Gachibowli Hyderabad
April 23, 2015

Tower G: 2nd Floor Slab laid

Residential Flats in Gachibowli
Feb 26, 2015

Tower G: Podium Slab laid

Residential Flats Narsingi
Jan 5, 2015

Tower G: Basement-2 Slab laid

New Construction Apartments
Dec 12, 2014

Tower G: Basement-1 Slab laid

Residential Flats
Dec 1, 2014

Tower G: Construction begins

New construction Flats Sales